An Arizona solar proposal should start with your electricity provider and rate plan. Two homes in the Phoenix area can face different billing rules. The useful question is not simply how many panels fit, but how the proposed system changes your actual bill.
Home Solar Simplified · Sources checked November 8, 2026 · Editorial standards
APS explains solar billing through a service plan and an export-credit rider. SRP publishes its own solar plans and export terms. Do not apply an APS estimate to an SRP account, or treat either utility's rules as statewide. Find the utility and exact plan name on your bill before comparing proposals.
Separate electricity used at home from electricity exported
Ask for three separate estimates: total solar production, the part used directly by your household, and the part sent to the grid. APS describes export compensation through its renewable riders. SRP's Conserve 6–9 p.m. and Save solar plan distinguishes exports from net metering. A proposal should identify the actual tariff used in its calculation.
Compare the remaining bill, not just the panel payment
Request a month-by-month comparison that shows grid purchases, export credits, recurring charges and the solar payment separately. Ask what happens when you run air conditioning later in the day, add an electric vehicle or change plans. Keep a copy of the assumptions so a future bill can be compared with the sales estimate.
Ask what a battery is meant to accomplish
Decide whether your priority is outage backup, shifting usage or both. Ask the installer to list the circuits the proposed system will support and the assumptions behind its runtime estimate. Have the solar-only and solar-plus-battery proposals priced separately so the extra equipment has a clear purpose.
Bring these details to three comparable quotes
Your utility, rate plan and 12 months of electricity use
Expected annual production and monthly grid imports and exports
The export rider or solar plan used in the estimate
Cash price, financing charges, equipment and installation scope
Battery backup circuits, warranty responsibilities and roof work
Compare the same project scope. A smaller monthly payment can come with a longer term or additional charges. Ask each company to explain any assumption that differs from the others.
Start with your bill and your questions
Use the energy checkup to organize what you know. Then tell us what you want help understanding. Educational coverage of a state does not guarantee an installer introduction or service at your address.