Home Solar Simplified logo
Menu
Getting started

What Happens After You Request a Solar Quote?

As of October 26, 2026, a solar quote request can lead to bill review, a preliminary proposal and a site assessment. It is not a contract; verify consent, price, financing and responsible companies.

What Happens After You Request a Solar Quote? — homeowner solar guide

Quick answer: what happens after you request a solar quote?

A quote request usually starts a fact-finding conversation, not a purchase. A provider may confirm your utility, 12 months of electricity use, roof and electrical basics, ownership and goals before preparing a preliminary proposal or arranging a site assessment.

A quote request is not a contract, loan application or permission to install. You have no obligation to sign. Verify who received your information, compare written offers and authorize each later step separately.

Step 1: identify who received your request and what contact you authorized

A form on a direct installer website and a lead-generation marketplace are not the same path. The direct installer may contact you itself; a marketplace may route the request to one or more sellers. Before submitting, read the named companies, privacy notice and contact consent. Save a copy or screenshot of the page and consent language.

FTC guidance says sales robocalls require written permission, and companies calling a number on the National Do Not Call Registry generally need permission or another narrow exception. If contact becomes unwanted, tell the company to stop and record the date. Do not treat caller ID, a utility-sounding name or a government-sounding pitch as proof of identity.

Step 2: expect questions about the home, bill and your goals

A useful first conversation should ask for the serving utility, rate plan, 12 months of electricity use in kWh, roof age, shade, home ownership and planned loads such as an EV or heat pump. A recent utility bill can help confirm usage and tariff assumptions, but ask which fields are actually needed and use a trusted upload channel.

A preliminary quote should not require your Social Security number, bank credentials or a hard credit inquiry. Those belong only to a financing application you intentionally choose after reviewing the lender, disclosures and scope. Ask whether a soft or hard credit check is proposed and provide separate, informed authorization.

Step 3: treat the first design and price as preliminary

Remote imagery and bill data can support a preliminary proposal showing system size, equipment, estimated annual production, cash price and possible financing. They cannot confirm every roof, attic, meter, service-panel or trenching condition.

Require the proposal to label assumptions, exclusions and optional work. Ask for the exact equipment models, DC system size, estimated monthly and annual kWh, utility tariff, remaining-bill estimate, roof or electrical allowances and a lower-production scenario. A sales estimate is not a utility guarantee.

Step 4: understand the site assessment

A site assessment may inspect roof condition, measurements, shade, attic access, rafters, the main electrical panel, meter location, grounding, conduit routes and possible battery or backup-equipment locations. Ask who will visit, which company employs or contracts with that person, and whether photographs or interior access are needed.

The survey can reveal roof repairs, a service upgrade, structural work or a different layout. Any material price or scope change should appear in a written change order or revised proposal that you can review before agreeing. A verbal explanation is not a substitute for updated documents.

Step 5: separate the seller, contractor, installer, financier and utility

Write down the legal contracting entity and verify its active license and classification with CSLB. Also identify the home improvement salesperson, installation subcontractor, designer, permit applicant, warranty servicer and monitoring provider. A brand or marketplace name may not be the company legally responsible for construction.

If financing or third-party ownership is offered, separately identify the lender or third-party owner, payment recipient, lien or security-interest terms, transfer process and service obligations. The utility does not select or endorse the installer; it reviews the interconnection and later issues permission to operate when requirements are satisfied.

Step 6: compare written proposals before choosing

CSLB advises getting three detailed bids. Give each provider the same usage history and compare the same scope: exact equipment, system watts, modeled kWh, roof and electrical work, permits, interconnection, monitoring, battery and backup design, warranties, exclusions and responsible companies.

Compare the cash price before financing. For a loan, record the amount financed, APR, dealer fees, term, total of payments and any assumed lump-sum prepayment. CFPB reports that some solar-specific loans include substantial markups above the cash price; that warning does not establish a fee on your offer, so require both prices in writing.

Step 7: know when the process becomes contractual

Before a California residential solar contract, reconcile the proposal with the Solar Energy System Disclosure Document, installation contract, production assumptions, warranties and any separate financing agreement. CSLB says the solar contract and disclosure must use the same language principally used in the sales presentation or marketing.

A qualifying home-solicitation or home-improvement contract generally provides three business days to cancel, or five business days when the buyer is 65 or older; exceptions exist, including contracts negotiated at the contractor's place of business. Use the notice and deadline in your actual contract and send cancellation in the required written form rather than relying on a general article.

Step 8: after signing, expect design, permits, installation and inspection

After the cancellation period and required approvals, the contractor typically finalizes engineering, applies for a building permit and utility interconnection, orders equipment, schedules installation and completes required inspections. Ask for one written project schedule and status contact, but treat dates as estimates unless the contract makes them enforceable.

Do not authorize substitutions, roof work, service upgrades or added charges only by phone. Keep signed change orders, permit records, equipment serial numbers, inspection approvals, warranties, loan documents and communications in one project file.

Step 9: do not operate the system before utility approval

Installation is not the last step. The local authority must approve the building permit, and the serving utility must complete its interconnection review. SCE says permission to operate follows a complete application and review; LADWP also requires its interconnection steps before issuing a permission-to-operate notice.

Wait for written permission to operate before turning on a grid-connected system. Then verify monitoring access, utility billing setup, warranty contacts, shutdown instructions and the final as-built equipment against the contract.

Bottom line: move one documented decision at a time

Requesting a quote should give you information, not create urgency. Confirm contact consent, protect sensitive data, verify every responsible company, compare three detailed bids and let the site findings update the proposal before signing.

Current IRS guidance says the homeowner Residential Clean Energy Credit is unavailable for property placed in service after December 31, 2025. A 2026 quote should not subtract a presumed 30% homeowner credit. Pause whenever price, equipment, financing, utility assumptions or responsibilities do not reconcile on paper.

Frequently asked questions

Does requesting a solar quote create a contract?

No. A quote request normally starts information gathering and may produce a preliminary proposal. It is not by itself an installation contract, financing agreement or permission to perform work, and you have no obligation to sign.

What information is normally needed for a preliminary solar quote?

Expect questions about the utility, rate plan, 12 months of electricity use, roof age and shade, home ownership and planned loads. Ask which bill fields are needed and use a trusted channel rather than sending unnecessary account details.

Should I provide my Social Security number for a solar quote?

Not for a preliminary price and design. A Social Security number or hard credit inquiry belongs to a financing application you intentionally authorize after identifying the lender and reviewing the terms.

Why can a solar quote change after the site assessment?

Remote imagery cannot confirm every roof, structural, attic, meter, main-panel or conduit condition. Require any material change in equipment, price or work as a revised proposal or written change order before agreeing.

How many solar quotes should I compare?

CSLB recommends three detailed bids. Compare the same equipment and work, complete cash price, expected production, utility assumptions, financing, warranties, exclusions and legally responsible companies.

Who should be identified before I sign a California solar contract?

Identify the salesperson, legal contracting entity, installation subcontractor, financier or third-party owner, permit and interconnection applicant, and warranty servicer. Verify the contractor and salesperson directly with CSLB.

How long do I have to cancel a California solar contract?

A qualifying home-solicitation or home-improvement contract generally provides three business days, or five business days for a buyer age 65 or older. Exceptions apply, so follow the cancellation notice and deadline in the actual contract.

When can a newly installed solar system be turned on?

After permit inspection and the serving utility's interconnection review, wait for written permission to operate. Installation completion alone does not authorize operation of a grid-connected system.

Questions worth asking

  • Does requesting a solar quote create a contract?
  • What information is normally needed for a preliminary solar quote?
  • Should I provide my Social Security number for a solar quote?
  • Why can a solar quote change after the site assessment?
  • How many solar quotes should I compare?
  • Who should be identified before I sign a California solar contract?
  • How long do I have to cancel a California solar contract?
  • When can a newly installed solar system be turned on?

Related guides

Compare solar quotes on the same scopeUnderstand one solar sales-and-fulfillment modelVerify a California solar companyAsk six questions before signingCompare solar financing optionsUnderstand California solar cancellation stepsSeparate equipment and workmanship warrantiesCheck whether the roof is ready for solarDecide whether solar fits your home

Still researching solar?

Search homeowner guides by topic, electric utility, or location.

Sources and further reading

Sources reviewed: October 26, 2026. Confirm changing details with the official sources.

These links identify documents and resources used for this guide. Listing a source does not mean it was independently checked today. Utility rates, incentives, product specifications and program availability may change; confirm the latest version and effective date with the source.

U.S. Department of Energy — Step-by-Step Guide for Consumers Going SolarU.S. Department of Energy — Choosing a Solar InstallerU.S. Department of Energy — Homeowner's Guide to SolarCalifornia Public Utilities Commission — Solar Consumer Protection GuideCalifornia Contractors State License Board — Solar RequirementsCalifornia Contractors State License Board — Solar SmartCalifornia Contractors State License Board — Home Improvement Contract GuideConsumer Financial Protection Bureau — Solar Financing Issue SpotlightFederal Trade Commission — National Do Not Call Registry FAQsFederal Trade Commission — Solar Power for Your HomeIRS — Residential Clean Energy CreditSouthern California Edison — Submit Solar Interconnection DocumentsLADWP — Interconnection Program

Start with a home energy checkup

Organize your usage, home details and goals before comparing proposals.

Try the home energy checkup

Ready to compare companies?

Explore provider options when you are ready to request quotes.

Explore provider options
Back to Articles