DAC-SASH No-Cost Solar: Eligibility, Application and Roof Requirements

DAC-SASH is accepting applications for qualifying income-qualified homeowners served by PG&E, SCE or SDG&E. Check all four eligibility rules, required documents and the home's technical readiness before relying on approval.

Published by Home Solar Simplified · Editorial standards

https://homesolarsimplified.org/solar-guides/dac-sash-free-solar

How this guide is supported

Published by Home Solar Simplified. Includes 5 linked sources. Documented editorial date: .

A citation or editorial date does not guarantee a tariff, incentive or program remains unchanged today.
DAC-SASH No-Cost Solar: Eligibility, Application and Roof Requirements — homeowner solar guide

No-cost rooftop solar assistance is not a general offer available to every California homeowner. DAC-SASH has specific eligibility requirements, and a household's address, utility service and other program criteria matter.

Check the current program rules and enrollment status with the official administrator before assuming you qualify. Be cautious of anyone using the program's name to promise free panels, demand an immediate signature or charge an unexplained application fee.

Quick answer: all four household and address rules must be true

DAC-SASH can provide a no-cost rooftop solar installation only when every listed eligibility rule is met: the applicant receives electric service from PG&E, SCE or SDG&E; owns and occupies a single-family home as a primary residence; the address is in a qualifying disadvantaged community; and total household income is within the current CARE or FERA limit. LADWP and Burbank electric accounts do not meet the listed utility rule.

At this guide's October 24, 2026 review, the CPUC said the program was accepting applications and identified GRID Alternatives as administrator. An open intake form is not an approval, funding reservation or promise that the home can be installed.

Use the current income table and exact address

GRID publishes a 2026–2027 CARE/FERA income table by household size on its current eligibility page. Use that live table instead of copying an older advertisement. Ask GRID which people and income sources count for the household and which proof it will accept.

Check the actual property in the eligibility tool linked by GRID. A nearby qualifying block, ZIP code or neighbor does not establish that a parcel qualifies. Treat the map as a screen and GRID's completed review as the program decision.

Prepare the minimum application documents

The current CPUC handbook says GRID works with the applicant to collect, at minimum, proof of income, proof of homeownership, the most recent utility bill and electrical-usage information when available. Submit through GRID's official channel; the handbook says applications from outside entities are not accepted by the administrator.

Keep copies of what you submit and any confirmation. Do not email sensitive household documents to an installer or lead seller merely because it advertises access to a government or utility program.

Eligibility is followed by a technical home review

Passing the utility, ownership, location and income screens does not mean every roof can proceed immediately. GRID still evaluates system design, shading, electrical work, structural suitability, permitting and interconnection. Its latest published progress report says long waitlists exist for homeowners who need new roofs or other essential upgrades because available supplemental resources do not meet demand.

Ask GRID in writing which preparatory work, if any, is required for your home, whether funding exists for it, what would remain your responsibility, and whether the project can be paused or closed if the work cannot be completed.

No-cost does not mean every related offer is included

The CPUC describes DAC-SASH as no-cost rooftop solar for qualifying homeowners. That description does not automatically include a separate battery, roof replacement, service-panel work beyond the approved scope or another company's financing offer. Request a written scope, ownership explanation, maintenance responsibility and list of any excluded work before agreeing.

The current handbook allows applicant-owned systems and an administrator-controlled third-party-ownership model. If a third-party arrangement is proposed, ask GRID to identify the approved model, system owner, transfer process and homeowner obligations in writing. Do not rely on a salesperson's generic description of ownership.

Apply through GRID, then keep unrelated sales offers separate

Start with GRID's official online eligibility form or call 866-921-4696 for prescreening. Have the utility bill, ownership information, household-income documents and questions about the roof ready. Eligibility screening remains separate from technical approval and an installation schedule.

If someone asks for a screening fee, solar loan or battery purchase as a condition of receiving the advertised no-cost installation, verify that request directly with GRID using its published contact information before paying or signing. Keep unrelated loan, lease, PPA, battery and roof offers outside the assistance application so each commitment can be evaluated on its own.

Prepare the home review without paying for speculative work

Before a site visit, assemble information that helps the reviewer understand the property: approximate roof age, any known leaks, previous electrical work, existing solar equipment and planned alterations. Photograph accessible areas from a safe location rather than climbing onto the roof. Mention a planned roof replacement, addition or tree removal, because a design based on conditions that will soon change may need revision. Ask which issues the program reviewer needs to evaluate and which documents can wait until requested.

Do not order a roof replacement or electrical upgrade merely because a third party says it will improve your chances. First request the administrator's written description of the issue, whether the work is necessary for the proposed project and whether resources exist to address it. If another contractor offers to complete preparatory work, compare that separate scope and price independently. The household should know what it would owe even if the solar application never reaches installation.

Agree on access, ownership and the handover record

Ask who needs access to the property and how appointments will be arranged. If several adults share ownership or a trust holds title, ask which signatures and documents are required before assuming the application is complete. Do not guess how an unusual ownership situation will be treated. Provide accurate information through the administrator's approved channel and request clarification where the forms do not fit the facts.

Before installation, ask for a plain-language explanation of the approved system arrangement, where equipment will be located and who is responsible for future service. Request a contact for reporting an inverter fault, damaged equipment or a roof concern. If ownership or occupancy changes later, knowing the correct contact and agreement will be more useful than relying on the name of the person who first visited the home.

At handover, organize the final agreement, permit and inspection records, utility authorization, equipment model and serial numbers, warranties and monitoring instructions. Ask the installer to demonstrate how to recognize normal operation and how to report an alarm without opening electrical equipment. Keep a paper or downloadable copy rather than relying only on a salesperson's portal. The aim is a system the household can maintain and understand over time, including if the original contact leaves the organization.

Plan how to review the utility bills after activation. Ask which charges are expected to remain, where generation is measured and how to distinguish a monitoring outage from a production outage. Record the permission-to-operate date so that a partial first bill is not confused with a complete operating month. If the household later adds an EV, heat pump or other significant load, retain the original production estimate and explain the changed consumption when seeking advice. A higher bill after a major new appliance does not by itself show that the solar equipment has failed. Clear records help the administrator or service provider diagnose the actual issue.

How to assess a rooftop solar design

  1. Review the roof. Document roof condition, remaining service life, usable space, orientation, shade and any planned repairs before committing to a layout.
  2. Compare power with energy. System capacity is rated in kW; annual generation is estimated in kWh. Request the assumptions for weather, shade, orientation and system losses.
  3. Confirm installation responsibilities. Ask who prepares plans, obtains permits, schedules inspections, handles utility interconnection and provides warranties for roof penetrations and equipment.

For further independent technical context: U.S. Department of Energy — Homeowner's Guide to Going Solar. This is an educational reference, not an installer recommendation.

Frequently asked questions

Is DAC-SASH accepting applications now?

Yes. At this guide's October 24, 2026 review, the CPUC listed DAC-SASH as accepting applications and GRID Alternatives as administrator. Intake availability does not guarantee household eligibility, technical approval, funding or an installation date.

What are the four DAC-SASH eligibility requirements?

GRID says an applicant must meet all four: PG&E, SCE or SDG&E electric service; ownership and occupancy of a single-family primary residence; an address in a qualifying disadvantaged community; and total household income within current CARE or FERA limits.

Can an LADWP or Burbank customer qualify for DAC-SASH?

Not under GRID's listed electric-utility requirement. The account must receive electric service from PG&E, SCE or SDG&E. LADWP and Burbank customers should check programs offered for their own utility account.

Does passing the income and address screen guarantee installation?

No. GRID must complete the application review, and the home still needs technical evaluation. Roof, structure, shading, electrical, permitting or interconnection conditions can affect whether and when a project proceeds.

Does no-cost DAC-SASH solar include a new roof or battery?

Do not assume it does. Ask GRID for the approved scope and any excluded work. GRID's latest progress report says homes needing roof or structural upgrades can face long waits because supplemental resources do not meet demand; a separate battery or financing offer should be evaluated independently.

Which documents should I prepare for DAC-SASH?

The current CPUC handbook identifies proof of income, proof of homeownership, the most recent utility bill and electrical-usage information when available as the minimum documents GRID works with an applicant to collect.

Check eligibility and take the next step

These links open the official program or its application service.

Check DAC-SASH household eligibility Start a GRID Alternatives application

Questions worth asking

  • Does my electric account meet the listed utility requirement?
  • Is my exact address inside the program’s qualifying area?
  • Which income and ownership documents are required?
  • What work is included, and could anything require my payment?

Related guides

Check utility and household eligibilitySee all solar rebates and assistance optionsCompare SCE solar-and-storage assistanceCheck the separate LADWP assistance pathCheck roof and insurance issues before installationKeep separate financing offers in contextReview any separate solar contract before signingVerify a company making program claimsLearn how solar loans and financing terms work

Still researching solar?

Search homeowner guides by topic, electric utility, or location.

Sources and further reading

Updated: October 2026. Confirm changing details with the official sources.

These links identify documents and resources used for this guide. Listing a source does not mean it was independently checked today. Utility rates, incentives, product specifications and program availability may change; confirm the latest version and effective date with the source.

CPUC — Current DAC-SASH application statusGRID Alternatives — Eligibility rules and 2026–2027 income limitsCPUC — Current Single-Family Solar Homes Program HandbookGRID Alternatives — Q3–Q4 2025 DAC-SASH progress reportGRID Alternatives — Official eligibility form

Start with a home energy checkup

Organize your usage, home details and goals before comparing proposals.

Try the home energy checkup

Ready to compare companies?

Explore provider options when you are ready to request quotes.

Explore provider options
Back to Articles