California Solar Export Credits: What Extra Electricity Is Worth
As of October 26, 2026, California has not one statewide export rate but utility- and tariff-specific credits. Identify the generation provider, tariff vintage and each export interval before valuing them.

Quick answer: California does not have one statewide export rate
As of October 26, 2026, the value of exported rooftop-solar electricity depends on the serving utility, generation provider, tariff vintage and the interval when energy reaches the grid. For PG&E, SCE and SDG&E customers on Net Billing—called the Solar Billing Plan by the utilities—Energy Export Credits vary by time instead of matching the retail import price.
Audit the account before using any rate table: identify the utility, any community choice aggregator, the interconnection application date, permission-to-operate date and current tariff. LADWP and other municipal utilities use their own adopted rules rather than the CPUC investor-owned-utility Solar Billing Plan.
Route the account before calculating a credit
First determine whether the electric account is served by PG&E, SCE, SDG&E, LADWP or another utility. Then check whether a community choice aggregator supplies generation while the investor-owned utility still provides delivery and billing.
Do not assume a home in Los Angeles County is on SCE, CPA or LADWP based only on its ZIP code. The current bill is the controlling starting document because neighboring addresses can have different providers and tariffs.
Confirm legacy NEM or Net Billing from the interconnection record
The CPUC says the Net Billing Tariff applies to PG&E, SCE and SDG&E customers who submitted an interconnection application on or after April 15, 2023. Earlier qualifying systems may remain on a legacy NEM tariff, subject to the account's eligibility and transition history.
Record the application date, permission-to-operate date, tariff name and any later account or ownership changes. Those facts are the tariff vintage; a proposal that says only 'NEM 3.0' is not enough to reproduce a bill.
Use the interval formula, not a statewide average
For an interval-based audit, start with hourly exported kWh and multiply each interval by the applicable export-credit component or components. SDG&E's published method describes the full Energy Export Credit as the sum of corresponding delivery and generation components for each hour and weekday or weekend category.
Then total the interval credits for the billing period and compare them with the detailed export-data table and bill. Keep units explicit: exported kWh × dollars per kWh = credit dollars. A monthly average may summarize the result, but it cannot reproduce which hours earned it.
Month, hour and day type can all change the schedule
Published schedules can distinguish month, hour, weekday, weekend and holiday treatment. The relevant schedule is the one effective for that utility, provider, tariff vintage and billing period—not a screenshot copied from another homeowner.
When exporting interval data, preserve timestamps and confirm how the utility labels the time zone and daylight-saving transitions. A one-hour shift can map exported energy to a different published value.
Import prices and export credits answer different questions
The retail rate paid when the home imports electricity is not automatically the credit applied when the home exports. Under Net Billing, the homeowner should model self-consumption, grid imports and grid exports separately.
Using solar in the home can avoid an import at the applicable retail rate, while exporting that same kWh earns the interval export credit. This distinction is why a solar proposal should show hourly load and production assumptions rather than netting annual kWh at one price.
Separate delivery and generation on CCA accounts
A community choice aggregator can handle the generation portion while SCE, PG&E or SDG&E handles delivery and the consolidated bill. Clean Power Alliance, for example, says it applies generation charges and credits while SCE applies delivery charges and credits for its Solar Billing Plan customers.
A CCA account can also have transition-specific rules. Read both providers' tariff pages and the actual bill instead of substituting the investor-owned utility's generation value for the CCA value.
Check any export compensation adder and its clock
The CPUC says eligible residential PG&E and SCE customers who apply to interconnect Net Billing facilities before the end of 2027 receive an export compensation adder for nine years. It also lists exclusions, including SDG&E customers and certain systems required by building code.
Confirm eligibility, the amount and the start date in the utility record. Do not treat an adder as permanent, available to every customer or transferable without checking the governing tariff.
Do not confuse monthly credits with net surplus compensation
Utilities can carry unused Energy Export Credits forward and reconcile them at an annual True-Up. That accounting is not the same as a promise that every displayed credit is cash payable to the customer.
Legacy NEM net surplus compensation is a separate annual concept with its own eligibility and calculation. Label monthly export credits, carried balances, bill offsets and any final settlement separately when reviewing a statement.
Model battery shifting as a scenario, not a guarantee
A battery can store midday solar for later household use or, where allowed and configured, export at a different time. Its value depends on the tariff, control settings, round-trip losses, reserve, equipment limits, warranty treatment and installed cost.
Compare at least a solar-only case, a battery self-consumption case and any allowed export case using the same load and solar data. Evaluate outage backup separately; bill savings do not measure resilience.
Reproduce one bill before trusting a long-term forecast
Download the detailed bill, interval export file and effective export-pricing schedule. Record the utility, CCA, tariff name, application and permission-to-operate dates, billing dates and schedule revision.
Map each interval to its month, hour and day type; multiply by the applicable component or components; total the period; then reconcile delivery, generation, carried credits and charges. Investigate differences instead of forcing the result to match.
Require a proposal to show auditable hourly assumptions
Ask for the hourly production model, hourly household load assumption, self-consumed kWh, exported kWh, imported kWh, every import and export schedule, escalation assumptions and battery dispatch rules. Each volatile source should include its URL and effective date.
Reject a savings chart that applies one retail rate to every exported kWh or hides CCA, fixed-charge, battery-loss or annual-settlement treatment. A transparent low, base and high case is more useful than a single guaranteed-looking number.
LADWP uses a separate municipal net-metering rule
LADWP is a municipal utility, not one of the CPUC-regulated investor-owned utilities using the Solar Billing Plan. Its published net-metering rider describes two-directional measurement and credits under the applicable LADWP rate schedule.
For an LADWP address, use the current LADWP bill, rate schedule, interconnection documents and net-metering rider. Do not import SCE hourly export values into an LADWP analysis.
Bottom line: keep a one-page export-credit record
Keep the utility and generation provider, tariff and vintage, interconnection and permission-to-operate dates, current import rate, export schedule revision, adder eligibility and end date, annual settlement month, battery mode and downloaded interval files together.
Update the record when the rate, provider, tariff, battery settings or account changes. That evidence makes a bill review repeatable and prevents a statewide average from being mistaken for the home's actual credit.
Frequently asked questions
Is there one California solar export rate?
No. The applicable value depends on the utility, generation provider, tariff vintage, billing period and export interval. Municipal utilities such as LADWP use separate rules.
How is each hourly solar export credit calculated?
Start with exported kWh in each interval, match it to the effective export-pricing schedule and multiply by the applicable delivery and generation component or components. Then total the intervals and reconcile the bill.
Why can a solar bill show separate delivery and generation credits?
Electric delivery and generation can be priced or provided separately. On a CCA account, the investor-owned utility may handle delivery while the CCA handles generation.
Does a community choice aggregator change solar export credits?
It can change the generation-side calculation and settlement. Check both the CCA and delivery utility rules, plus the actual bill and tariff vintage.
What do tariff vintage and the nine-year export-credit period mean?
Tariff vintage identifies the rules tied to the account's interconnection history. Some eligible PG&E and SCE Net Billing customers receive an export compensation adder for nine years; verify the account-specific start, end and exclusions.
Are unused solar export credits paid as cash at True-Up?
Not necessarily. Carried Energy Export Credits, bill offsets, annual reconciliation and net surplus compensation are different accounting categories. Read the utility's current bill guide and tariff.
Does a battery always increase the value of exported solar?
No. Results depend on tariff timing, allowed dispatch, efficiency losses, reserve, warranty, installed cost and household use. Model solar-only and battery cases separately.
How can I audit the export credits on my solar bill?
Download the detailed bill, interval export data and effective schedule; preserve timestamps; calculate each interval; then reconcile delivery, generation, carried credits and charges.
Questions worth asking
- Is there one California solar export rate?
- How is each hourly solar export credit calculated?
- Why can a solar bill show separate delivery and generation credits?
- Does a community choice aggregator change solar export credits?
- What do tariff vintage and the nine-year export-credit period mean?
- Are unused solar export credits paid as cash at True-Up?
- Does a battery always increase the value of exported solar?
- How can I audit the export credits on my solar bill?
Related guides
Compare PG&E NEM 2 self-use and EV charging timingStart with solar imports, exports and tariff typesModel battery shifting under Net BillingDiagnose the remaining utility billRead SCE Solar Billing Plan mechanicsSeparate SCE monthly and annual settlementRoute a Los Angeles-area home to LADWP or SCEAudit a high bill after solarDecide whether a battery fits the homeStill researching solar?
Search homeowner guides by topic, electric utility, or location.
Sources and further reading
Sources reviewed: October 26, 2026. Confirm changing details with the official sources.
These links identify documents and resources used for this guide. Listing a source does not mean it was independently checked today. Utility rates, incentives, product specifications and program availability may change; confirm the latest version and effective date with the source.
California Public Utilities Commission — Net Energy Metering and Net BillingCalifornia Public Utilities Commission — Net Billing TariffCalifornia Public Utilities Commission — California Solar Consumer Protection GuideSouthern California Edison — Understanding Solar Export PricingSouthern California Edison — How the Solar Billing Plan WorksSouthern California Edison — Understanding Your Solar BillPG&E — Solar Billing PlanPG&E — Solar Billing Plan GuidePG&E — Net Surplus CompensationSan Diego Gas & Electric — Solar Billing Plan Export PricingSan Diego Gas & Electric — Understanding Your Solar BillSan Diego Gas & Electric — Understanding Export PricingClean Power Alliance — Solar and Net Energy MeteringLos Angeles Department of Water and Power — EV, NEM and REO RatesStart with a home energy checkup
Organize your usage, home details and goals before comparing proposals.
Try the home energy checkupReady to compare companies?
Explore provider options when you are ready to request quotes.
Explore provider options